Outbound Parkway East Overhead Sign Inspections Saturday
There will be single-lane closures and traffic shifts during the outbound Squirrel Hill Tunnel closure.
Overhead sign safety inspections on the outbound Parkway East will occur on Saturday morning, April 6, weather permitting. Work requiring intermittent single-lane closures and traffic shifts will occur from 6 a.m. to noon on the outbound Parkway East between Churchill (Exit 79B) and the Monroeville/Plum (Exit 84) interchanges. Two of three outbound lanes will remain open at all times. Inbound traffic will not be affected. There is also an outbound Squirrel Hill Tunnel closure this weekend. Mackin Engineering and the Sofis Rigging Company will conduct the work. ___________________ Plum-Oakmont Patch is on Facebook and on Twitter. Don't forget to sign up for our daily email newsletter by clicking here.
In this Article: